Development of turbocharger leak and vibration tester/ Erac John Carrasco, Andrew A. Perucho, Ruben Carlo P. Solasco, Jerald Tolentino, and Harvey P. Vicmundo
Publication details: Manila: Technological University of the Philippines, 2020Description: 78pages: 28cm. Illustration; CD-ROM (4 3/4in)Subject(s): LOC classification:- BTH TL 210 C37 2020
| Item type | Current library | Shelving location | Call number | Copy number | Status | Notes | Date due | Barcode |
|---|---|---|---|---|---|---|---|---|
Bachelor's Thesis CIT
|
TUP Manila Library | Thesis Section-2nd floor | BTH TL 210 C37 2020 (Browse shelf(Opens below)) | c.1. | 1 | For library use only | BTH0003164 |
Browsing TUP Manila Library shelves, Shelving location: Thesis Section-2nd floor Close shelf browser (Hides shelf browser)
No cover image available
|
No cover image available
|
No cover image available
|
No cover image available
|
No cover image available
|
No cover image available
|
No cover image available
|
||
| BTH TL 146 P34 2022 Development of Anti-Vehicle Theft Device | BTH TL 146 P47 2023 Development of brake pads setting tool/ | BTH TL 146 T68 2023 Development of rotating tool hanger withused oil storage and 12v electric suction pump/ | BTH TL 210 C37 2020 Development of turbocharger leak and vibration tester/ | BTH TL 220 A34 2022 Development of battery-operated portable lifter | BTH TL 430 C36 2022 Development of smart bicycle/ | BTH TL 440 F73 2022 Development of motorcycle rider jacket with signal lights and automatic emergency kill switch/ |
Includes bibliography
his study entitled "Development of Turbocharger Leak and Vibration Tester"aimed to help technicians better assess and troubleshoot the performance of a single turbocharger and to lessen the expenses of the customer. Most service centers and auto repair shops in the Philippines do not fix the turbocharger. Instead, they replace it with a new one which is not cost-efficient. The project is composed of a universal column Hbeam, steel flat bar, square bar, shafts, metal sheet, bolts, nuts and screws to form its frame or body. It is composed of different gauges primarily the pressure gauge and dial gauge. The project was evaluated by 10 respondents from different service centers with an overall mean of 4.73 and a verbal interpretation of highly acceptable. The evaluation process was based on functionality, durability, safety, economy, and workability. The procedure for operating and testing the prototype ranged from 10 to 15 minutes. This process may lead to productivity enhancement for every technician. The findings of the research can be used as a reference for similar future researches to make the prototype more industrially viable. Author's abstract.
There are no comments on this title.